Matrix NAC was awarded PECO’s Center Point substation installation project in Lansdale, PA.
Matrix NAC installed field steel supports, insulators, bus, CCVTs, and LAs along with the pre-manufactured control house, its internal wiring, the power and control cable (86,500 LF and 2,640 terminations), and tertiary supports.
- Installed field steel supports, insulators, bus, CCVTs, and LAs
- Installed control house, including internal wiring, 86,500 LF and 2,640 LF power and control cable terminations, and tertiary supports
- All underground conduits, ground grid, and trench
- (3) 500kV breakers and (5) switches
- (3) 230kV breakers and (6) switches