Matrix PDM Engineering provided engineering, design and equipment supply services for three new carbon steel tanks to store and handle methanol at Kinder Morgan’s Methanex terminal.

Overview
220000
barrel carbon steel tanks
100 %
commitment to safety
35 +
years of industry experience

Scope of Work

  • Design of three 220,000 barrel carbon steel tanks
  • Design for the addition of an eight-spot rail loading/ offloading and staging area and a two-bay truck loading/offloading rack
  • Piping distribution, including specifications, calculations, and drawings
  • Field investigations and determined locations of equipment, distances and routings for conduit and tray, existing PLC system and interface points to the control network
  • Specification and design for a new MCC building and gear
  • Utilized 3D design for all discipline design effort
  • Hardware specification and supply for all control systems equipment
  • Programming (SCADA system), pre-commissioning and startup for the new installation
  • Firewater/foam system design and specification
  • Designed the operations and administration building and guard shack
  • Provided upgrades to an existing barge dock, ship loadout dock, and other infrastructure

Let’s Talk: Contact Us About Your Next Project

Don’t just take our word for it

Read what the best in the business have to say about working with the Matrix operating companies.

Testimonials

This website is designed for modern browsers. Unfortunately, your browser is not that. Please download or open a modern browser, or and continue anyway.