In June 2023, the client engaged Matrix in response to concerns raised by their jurisdictional authority regarding the structural integrity of a nearly 50-year-old LNG storage tank. Matrix initiated the project with a comprehensive review of existing facility documentation, including as-built drawings and operational records, to help the client better understand potential integrity risks.

Subsequently, Matrix conducted a detailed LNG tank integrity assessment, which encompassed external inspections, fitness-for-service evaluations, and engineering design for retrofit modifications. These efforts were aimed at enhancing the safety, reliability, and operational performance of the existing LNG storage infrastructure while ensuring full compliance with current codes and regulatory standards.

In addition to the tank assessment, Matrix provided targeted support to address client concerns related to excessive tail gas and boil-off gas generation during liquefaction. Through root cause analysis, Matrix successfully identified the underlying issues and delivered actionable recommendations to optimize operational efficiency.

Overview
40 +
years of excellence
100 %
commitment to safety
50 YRS
Old Tank Assessment

PRINCIPAL FEATURES

  • Integrity assessment, inspection, and engineering design
  • Retrofit modifications and upgrades
  • Regulatory support
  • Fatigue and finite element analysis
  • Tail gas and BOG analysis
  • Safety systems evaluation

Let’s Talk: Contact Us About Your Next Project

Don’t just take our word for it

Read what the best in the business have to say about working with the Matrix operating companies.

Testimonials

This website is designed for modern browsers. Unfortunately, your browser is not that. Please download or open a modern browser, or and continue anyway.