The existing LNG peak shaving facility, originally constructed in 1975, was equipped with three reciprocating boil-off gas compressors. Following the failure of one unit, a temporary compressor was deployed to maintain operational reliability.
Matrix developed and executed a comprehensive plan to engineer, procure, and install two new oil-flooded rotary screw compressors, each rated at 2 MMscfd. This solution optimized the boil-off gas management system while ensuring uninterrupted plant operations.
This project successfully modernized critical infrastructure while maintaining continuous service, demonstrating Matrix’s ability to deliver complex upgrades in live operating environments.
scope of work
- Installation of new boil-off gas compressors within the existing compressor building
- Removal and demolition of the original reciprocating compressors
- Replacement of the boil-off gas heater
- Addition of a discretionary vent to enhance system flexibility
- Reprogramming of the PLC to integrate new equipment
- Execution of several ancillary tasks to support system performance and reliability

Principle Features
- Retrofit modifications and upgrades to existing LNG peak shaving facility
- FEED
- Detailed engineering
- Procurement
- Construction
- 2 x 100% oil-flooded rotary screw BOG compressors
- Critical online equipment replacement